Country: Algeria
Client: Sinopec/Sonatrac
Execution period: 2016-2017
Main Contractor: DR/Progress Engineering

Description, capacity, size

  • Flow rate 4,3 mil. nm3/day
  • Configuration: 2 + 1 (2Х50%).
  • TC unit: Siemens/Dresser Rand. Compressor: Dresser Rand. Turbine: Siemens with cap. 25 MW each.

Detailed Scope of Work

  • Survey, Basic Design for Process and Mechanical parts, Power Supply System, Plot Plan and Transport, Communication Systems, Control System (ICSS) and Instrumentation, HVAC, Water Supply, Sewerage Systems, Fire Extinguishing Systems;
  • Civil/Structure;
  • Fire & Gas Detection System;
  • Cathodic Protection System, HSE, Safety, QA/QC, Technical documents for procurement (Requisition, RFQ, TBE, RTA, review of vendors’ documents)
  • HAZID