Country: Russia
Client: TOTAL
Execution period: 2012-2017
Main Contractor: EPS

Description, capacity, size

DDetail Engineering of the development of NP1 Well Pad and related facilities, procurement services, construction supervision and work as Owner Engineer

Detailed Scope of Work

  • Survey and Detail Design for Process and Mechanical, Power Supply System, Plot Plan and Transport, Communication Systems, Control System (ICSS) and Instrumentation, HVAC, Water Supply, Sewerage Systems, Fire Extinguishing Systems; Civil/Structure; Fire & Gas Detection System; Cathodic Protection System, HSE, Safety, QA/QC, Technical documents for procurement (Requisition, RFQ, TBE, RTA, review of vendors’ documents)
  • HAZOP/HAZID/SIL assessment, FEHA, etc.
  • Designer’s Supervision at site
  • As-Built Documentation