Country: Russia
Client:LUKOIL
Execution period:2008 – 2010
Main Contractor: TOTAL/EPS

Description, capacity, size

  • Gas processing unit (dehydration, drying);
  • Gas compressor station: 2 low-pressure compressors 2,2 МW each (Рin = 6 bar, Рout = 16 bar), 3 high-pressure compressors 4,2 МW each (Рin = 40 bar, Рout = 160 bar);
  • Power generation station: 4 gas turbo-generators Solar GG, 6.4 MW each;
  • Crude oil processing facilities with capacity of 329 m3/hr;
  • Water Treatment Plant.

Detailed Scope of Work

Basic Design (FEED) updating, Detail Engineering, Operation Procedure incl.:

  • Process and Mechanical design;
  • Power Supply System design;
  • General Layout and Civil /Structure design;
  • Instrumentation System design;
  • Water Supply Systems design;
  • Fire & Gas Detection Systems design;
  • HSE/Safety/Quality
  • Technical documents for procurement (Requisition, RFQ, TBE, RTA, review of vendors’ documents)
  • HAZOP
  • Designer’s Supervision at site
  • As-Built Documentation