Country: Russia
Client: TOTAL
Execution period: 2012-2017
Main Contractor: TOTAL/EPS

Description, capacity, size

NP1 and EP2 WELL PADS including 16 km. of 8” pipeline

  • Detail Engineering of the development

Detailed Scope of Work

  • Survey and Detail Design,
  • Technical documents for procurement,
  • HAZOP/HAZID/SIL assessment,
  • FEHA, etc.,
  • Designer’s Supervision at site, As-Built