Country: Bulgaria
Client: BTG
Execution period: 2018-2021
Main Contractor: Arkad

Description, capacity, size

  • Gas pipeline length 484 km, dia 48″.
  • 21 block valve stations, 9 pig launchers and receivers

Detailed Scope of Work

  • Survey,
  • FEED,
  • Work as OWNER’s Engineer: – Expert Review of detail design documentation, interface and coordination with construction subcontractors (8 subcontractors), government authorities, engineering subcontractors, vendors